Plan the layout around how you cook
Think about where you prep, cook and clean, and how many people use the kitchen at once. Layout changes that move plumbing or gas cost more, so decide early.
Order long-lead items first
Cabinets and some appliances can take weeks to arrive. Ordering them during design keeps construction from stalling.
Rough-in, then cabinets
After demolition, electrical, plumbing and ventilation are roughed in and inspected. Then drywall, and cabinets are installed and leveled.
Counters, backsplash and lighting
Countertops are templated after cabinets are set. Backsplash, appliances and under-cabinet lighting follow, and the kitchen is ready to use.
Kitchen remodeling in Mountain View neighborhoods
Every Mountain View neighborhood has its own housing style, so kitchen remodeling in Mountain View is never one-size-fits-all. Here is how we approach it across Mountain View:
Old Mountain View, Mountain View: older bungalows near Castro Street, often needing electrical and plumbing upgrades.
Cuesta Park, Mountain View: family homes near the park, common for kitchen and addition projects.
Waverly Park, Mountain View: 1950s–60s ranch homes ready for open-plan remodels.
Monta Loma, Mountain View: a large Eichler tract where flat roofs and glass walls shape the design.
Shoreline West, Mountain View: a mix of single-family homes and townhomes.
Rex Manor, Mountain View: compact homes where smart storage makes a big difference.
Wherever you live in Mountain View, we check Mountain View permit requirements early so your project stays on schedule.
Material delivery times to Mountain View
We're based in Palo Alto, so job sites in Mountain View are close. Typical drive times from our base to Mountain View neighborhoods: Old Mountain View 15–20 min, Cuesta Park 20 min, Waverly Park 20 min, Monta Loma 15–20 min, Shoreline West 15 min, Rex Manor 15–20 min.
Typical material lead times for Mountain View projects (estimates, confirmed with suppliers per job): in-stock paint and LVP flooring 1–3 days; hardwood flooring 3–10 days plus 3–7 days of on-site acclimation; special-order tile 2–6 weeks; quartz or stone countertops 1–3 weeks after templating; windows and doors 4–10 weeks; custom cabinets 6–12 weeks.
Because suppliers deliver across Mountain View and the Peninsula, choosing long-lead items before demolition is the best way to keep a Mountain View remodel moving.
Also serving Palo Alto and Menlo Park
Beyond Mountain View, we remodel homes in Palo Alto, Menlo Park, Los Altos, Sunnyvale, East Palo Alto, Redwood City, Atherton, Los Altos Hills. Contact us to talk through kitchen remodeling for your Mountain View home.